Trail Conditions Update – Fire Activity 7/15

Red dot marks the location of 10-15 acre fire near popular 44 trails trailheads

Red dot marks the location of 10-15 acre fire near popular 44 trails trailheads. click for full size

The recent thunder and lightning storms have sparked a few fires around the area including a small one in the 44 trails zone.

The fire is located just east of the junction of 44 and 17 roads, not far from the Knebal and 8-Mile Crossing campgrounds, as well as the Super Connector (see red dot on map for location). The fire is small (10-15 acres) and the USFS is on it with a dozer and heli water drops. They expect full containment without incident, but they would like to ask forest users to avoid the area as much as possible. There are no official trail closures at this time, but there is increased fire vehicle traffic in the area.

If you are headed up to 44 to recreate, please be alert for fire traffic, give fire vehicles and associated personnel plenty of room and report any additional fire starts.

UPDATE: Fire is contained and in mop-up stage as of 5pm 7/15.

Trail Conditions Update 6/4

While Mother Nature has been melting snow and drying out access to the 44 Trail zone, log clearing stud Paul Gundlach has been cutting through blow down on the 450 trail. 450 is now clear to the junction with 15-Mile at the meadow. Thanks Paul!

Roads 4410 and 4420 are also now open to vehicle traffic.

What’s next you ask? Attention turns to clearing downed trees on Boulder Lakes!

Trail Conditions Update 5/19

Latest trail conditions update May 19:trail2

Knebal / Bottle Prairie – 75% clear of trees and tread dry – Hope to clear this week.

8-Mile – Good shape but there’s one big section of blowdown on streamside trail 20+ trees – hope to  clear this week.

High Prairie / 450 – Not ready. Snow on trails and tread too muddy for riding. 4410 road is also still closed due to snow. Please stick to lower trails.

15-Mile – Not ready. Needs clearing work. Hold use until after Memorial Day weekend, thanks.

Surveyor’s Ridge – Clear an ready to ride

Dog River – Clear and ready to ride

 

Current Conditions Report

Fresh snow

Fresh snow

44 Trails Conditions Report
May 9, 2014

It’s wet and muddy with snow in places. Please ride elsewhere until trails have time to drain and dry! 

We got a call from the ranger today (May 9, 2014) with a first hand report that it’s too muddy up in the 44 Road area for riding right now. We need some high pressure, sun and time for the soil to drain as well to melt new and lingering snow. The current storm system has only made already muddy trails worse with a combination of wet snow and rain depending on elevation and aspect. Please ride elsewhere this weekend to avoid damaging the trails. Normally, the bulk of the trails are ready by Memorial Day Weekend – only two weeks away but it’ll be a critical two weeks for drying and draining, plus some clearing work.

Lingering patches of snow up high - taken before recent storm

Lingering patches of snow up high – before recent storm

Hold tight and enjoy the lower elevation riding for now. Oakridge, Surveyor’s and Dog River have seen a lot of moisture in the past 48 hours and are also muddy right now. However, they are the best bet for ridable trails once the weather drys out again.

Trail Work Schedule

Sweet new trail signs!

Sweet new trail signs!

The dirt is top notch in the Gorge right now and the riding season for Mount Hood’s 44 Trails area is fast approaching. As of May 8, there is still some lingering snow and plenty of downed timber on the upper trails accessible from Forest Road 44. Typically, the bulk of the system will be cleared and ready to enjoy come Memorial Day Weekend.

In the meantime, we’ve set a schedule for summer trail work parties to keep our mission of maintenance and expansion moving forward. Please mark these dates in your calendars and join us when you can. We strive to work for 4-5 hours in the morning and then enjoy an afternoon trail session, so you don’t have to give up a day of riding! More details about each event will be provided as the date nears and as we evaluate trail needs:

June 14 – Celebrate National Trails Day with a 44Trails work party – (Nat. Trails Day is actually June 7, but our event will be on June 14)

July 26 -Mid summer work day to armor and maintain high-traffic areas

October 4 – TBA Special Event – riding related event to thank everyone for all their support

October 18 – Final trail day before winter transforms the forest floor

Although random acts of kindness in helping to clear the trails is appreciated, all significant clearing and trail work needs to be organized through the USFS to maintain trail standards. The process on 44 Trails is different from that in Post Canyon or Sandy Ridge, and we need your help adhering to this policy. We have a great relationship with the Mt. Hood and Barlow Ranger Districts, and we aim to keep it that way. If you have time and energy to help with trail work, please reach out to us. We have ongoing opportunities to help clear and maintain the trails outside of our scheduled events. Give us a shout and we can connect you with the details.

44 Trails Party!

44 Trails PartyRally around 44trails.org to help us celebrate a successful summer of trail work and to help plan for the future.

We’re throwing a party at Double Mountain Brewing in Hood River on October 17, 6pm-10pm. There will be a silent auction fundraiser with items ranging from jerseys to complete bikes and gifts certificates from local businesses.

We’ve also got a raffle planned. Raffle tix will be $5/each, and we’ve got a great collection of swag from the bike industry and local businesses alike.

Of course, there’s beer, too, and Arthur Lee Land will rock the house with tunes.

Come on down Thursday, Oct 17 and learn about future 44 Trails projects, get one of our new t-shirts and stickers and support the future of trail development in the 44 Trails zone.

 

Super Connector Work Day Sept 14

Kneabl Springs Trail

Knebal Springs Mt Hood Hood National Forest

The 44 Trails zone was spared any fire damage from the recent Government Flats wildfire, and the riding is as good as it gets right now. Recent rains have knocked back the dust for a primo riding experience.

If it’s not on your calendar already, Saturday September 14th is our next, and hopefully final, Super Connector trail work day. Here’s the beta:

Where: Meet 9am Little John SnoPark on Highway 35

What: Final tread development to link Knebal and Surveyors -bring hand tools if you’ve got ’em – shovels, rakes, McLeods

Required: Helmets and long pants (bike helmets are a-ok), don’t forget gloves and clothing to keep you happy rain or shine – bring water too.

Time: We expect to work til 12 or 1, so you can still enjoy a good ride post work day

New York City Subs is kicking in lunch food, Dog River Coffee is kicking in morning coffee. There’ll also a be a sweet little swag raffle to help say thanks for your work!

44 Trails Area is Open for Riding!

Updated fire closure map

Updated fire closure map

The 44 Trails zone on the Mount Hood National Forest is open for riding!

Thanks to favorable weather conditions and the efforts of wildland fire crews, the 44 zone is accessible again.

The 17 road remains closed, but 8-Mile, Knebal Springs and the rest of the 44 Trails are open for riding. Ranger Thornton was up in the area on Thursday and said there is moisture in the dirt and the trails are in great shape.

Here is the latest closure info:

Fire Closure Still in Place

It looks like the USFS is going to maintain its existing fire closure for the foreseeable future. Sorry, but the 44 Trails area will be closed for the Labor Day holiday weekend.

The wet and cooler weather has definitely aided in the management and suppression of the Government Flats fire that lead to the road and trail closures but there is still work to be done and fire hazard in the area. The burn has been spotty in areas, which makes mop up efforts a bit more difficult to monitor assess.

What we need is a big multi-day rain cycle. In the mean time, check out rides on Gunsight ridge and the Boulder Lake zone. You can keep tabs on the fire updates at www.inciweb.org/incident/3662/

Latest Fire Closure Update for 44 Trails

USFS 44 Trails closure map

USFS 44 Trails closure map

West winds have cleared the smoke from the Hood River Valley, but the 44 Trails area is still effected by closures. As far as we know, the trails themselves have not been consumed by fire, but there will be active fire suppression efforts in the area and the threat of fire growth, so the USFS is going to keep the zone east and north of the 44 road off limits for a while.

Here’s the latest:

The Mt. Hood National Forest has announced the following closures:

The following campgrounds are closed: Knebal Springs, Lower Eight Mile Crossing, Eight Mile, and Gibson Prairie. Five Mile Lookout is also closed.

The following major trails are closed:

  • Surveyors Ridge # 688 both south and north trailheads
  • Eightmile Loop #496
  • Knebal Springs # 474
  • Bottle Prairie #455
  • North-South #451
  • Oak Ridge #688A
  • Dog River #675
  • Zig Zag #678

Forest Roads 17, 1720, 4430 and all their associated spur roads are closed along with and all other National Forest System Roads and minor trails within the closure area depicted on a map posted on InciWeb.org at http://inciweb.org/incident/maps/3662/