Surveyor’s Ridge Trail Work – June 8, 2019

44T-surveyors ridge trailBig thanks to everyone who joined us on the May 25 work day!
We are back at it this coming Saturday, June 8 to continue working on the Surveyor’s Ridge reroute project

Help us create hand-built singletrack!

We will be doing light tread work and brushing of the reroute. The new trail creates four miles of singletrack and improves interconnectivity to trails in the vicinity by connecting with the Super Connector, Cooks Meadows and the Superduper Connector.

WHEN: 
Saturday June 8, 2019 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR at the sign-in and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Light duty brushing and treadwork on Surveyor’s ridge re-route.

TOOLS: 
Helmet or Hardhat REQUIRED (bike helmets ok)
Long pants, gloves and work boots REQUIRED
Water – please bring drinking water for yourself
Please bring your hand tool of choice: Flat Shovel, McCleod, Loppers, Metal Rake, Pulaskis.

TRAIL CONDITIONS UPDATE
And more trails are open! You can add Fifteen Mile and Cedar Creek to the list of open trails, which includes: Knebal Springs, Eightmile, Bottle Prairie, Superconnector, Surveyors and Dog River.

Some lingering snow and mud persist above 4500 feet. So High Prairie and 450 are not quite open for riding.

Can’t join us? Donate to help fund future trail projects in the 44 zone!