The Surveyor’s Ridge Reroute Continues!
A segment of the Surveyor’s Ridge Trail #688 will be impacted by the City of The Dalles Watershed Pipeline replacement project.
We re working on a re-route of the Surveyor’s Ridge trail where it follows the pipeline to maintain a semi-primitive trail experience. The reroute also improves interconnectivity of trails in the vicinity by connecting with the Super Connector and will provide a short loop for beginner riders who want a shorter trail experience than Surveyors Ridge. READ MORE about the Surveyor’s Ridge Reroute Project and check out project map.
Trail Work Day – Surveyor’s Ridge Reroute Project
REQUIRE EQUIPMENT:
Hardhats (bike helmets ok), long pants, work gloves and work boots, water.
WHEN:
Saturday, October 7, 2017 @ 9am – 2pm (plenty of time for a post-work-project ride)
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.
PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We will be doing rough in and route trimming/clearing.
TOOLS:
Helmet/hardhat (bike helmets ok), long pants, gloves, and work boots required.
Hand tools only – Flat Shovels, McCleods,Metal Rakes (NO chainsaws please).