Surveyor’s Ridge Trail Closure

44 Riders, the Dalles Watershed Pipeline Project is kicking into high gear. The construction activity means that the south end of the old Surveyor’s Ridge Trail is now closed through mid-November, which effectivley means for the season, ’cause snow in the high-country is on its way.

If you’re headed up that way, please avoid the work zone.

Surveyors-closure-map

October 16 Work Day

Bottle Prairie Trail Sign

October 16 – Bottle Prairie Work Day
Our final work party of the season! We’re headed to Bottle Prairie trail 455. It’s in need of brushing. If we get some significant rain between now and October 16, we’ll prob add some tread work in, too. But for now, we’ll plan on opening up sight lines and brushing overgrown sections.

As usual, we’ll have lunches for everyone thanks to NY City Subs in Hood River

WHEN:
Sunday, October 16, 2022 – 9 AM

WHERE:
Little John SnoPark Hwy 35

WHAT:
Varied Trail work on Bottle Prairie – lopping, brushing, clearing, and if the weather allows, possibly some tread work.
REQUIRED: Long Pants, Work Boots, Gloves, Day Pack, Water, Bike Helmet
Bring Hand Tools: Loppers, hand saws, metal rakes, hedge trimmers

Bring your bike! Depending on turnout, we can send groups in on bike to spread out the work zone, and there should be plenty of time to ride after the work is done.